| 000 | 01159cam a22002897a 4500 | ||
|---|---|---|---|
| 001 | 13137388 | ||
| 003 | KEPU | ||
| 005 | 20130726101758.0 | ||
| 008 | 030326s2002 maua b 001 0 eng d | ||
| 010 | _a 2003266452 | ||
| 020 | _a0876294603 | ||
| 035 | _a(OCoLC)ocm50783977 | ||
| 040 |
_aMEA _cMEA _dDLC |
||
| 042 | _alccopycat | ||
| 050 | 0 | 0 |
_aTH435 _b.H88 2002 |
| 245 | 0 | 0 |
_aHow to estimate with Means data & CostWorks : _blearn how to estimate using the nation's most recognized construction cost source / _cR.S. Means Company, Inc., and Saleh A. Mubarak. |
| 250 | _a[2nd ed.] | ||
| 260 |
_aKingston, MA : _bR.S. Means Co., _cc2002. |
||
| 300 |
_axviii, 190 p. : _bill. ; _c28 cm. + _e1 computer optical disc (4 3/4 in.) |
||
| 504 | _aIncludes bibliographical references (p. 183-186) and index. | ||
| 650 | 0 |
_aBuilding _xEstimates. |
|
| 700 | 1 |
_aMubarak, Saleh A. _q(Saleh Altayeb) |
|
| 710 | 2 | _aR.S. Means Company. | |
| 906 |
_a7 _bcbc _ccopycat _d2 _encip _f20 _gy-gencatlg |
||
| 942 |
_2lcc _cBK _hTH435.H88 2002 |
||
| 999 |
_c89887 _d89887 |
||