| 000 | 01625nam a22004815i 4500 | ||
|---|---|---|---|
| 001 | 978-1-84628-500-4 | ||
| 003 | DE-He213 | ||
| 005 | 20130515021139.0 | ||
| 007 | cr nn 008mamaa | ||
| 008 | 100301s2007 xxk| s |||| 0|eng d | ||
| 020 |
_a9781846285004 _9978-1-84628-500-4 |
||
| 024 | 7 |
_a10.1007/978-1-84628-500-4 _2doi |
|
| 050 | 4 | _aT55.4-60.8 | |
| 072 | 7 |
_aTGP _2bicssc |
|
| 072 | 7 |
_aTEC009060 _2bisacsh |
|
| 082 | 0 | 4 |
_a670 _223 |
| 100 | 1 | _aHo, William. | |
| 245 | 1 | 0 |
_aOptimal Production Planning for PCB Assembly _h[electronic resource] / _cby William Ho, Ping Ji. |
| 260 |
_aLondon : _bSpringer London, _c2007. |
||
| 300 | _bdigital. | ||
| 490 | 0 |
_aSpringer Series in Advanced Manufacturing, _x1860-5168 |
|
| 650 | 0 | _aEngineering. | |
| 650 | 0 | _aOperations research. | |
| 650 | 0 | _aEngineering design. | |
| 650 | 0 | _aIndustrial engineering. | |
| 650 | 0 | _aMachinery. | |
| 650 | 0 | _aElectronics. | |
| 650 | 1 | 4 | _aEngineering. |
| 650 | 2 | 4 | _aIndustrial and Production Engineering. |
| 650 | 2 | 4 | _aManufacturing, Machines, Tools. |
| 650 | 2 | 4 | _aMathematical Modeling and Industrial Mathematics. |
| 650 | 2 | 4 | _aEngineering Design. |
| 650 | 2 | 4 | _aElectronics and Microelectronics, Instrumentation. |
| 650 | 2 | 4 | _aOperations Research, Mathematical Programming. |
| 700 | 1 | _aJi, Ping. | |
| 710 | 2 | _aSpringerLink (Online service) | |
| 773 | 0 | _tSpringer eBooks | |
| 776 | 0 | 8 |
_iPrinted edition: _z9781846284991 |
| 830 | 0 |
_aSpringer Series in Advanced Manufacturing, _x1860-5168 |
|
| 856 | 4 | 0 | _uhttp://dx.doi.org/10.1007/978-1-84628-500-4 |
| 912 | _aZDB-2-ENG | ||
| 999 |
_c74257 _d74257 |
||