| 000 | 01477cam a22003374a 4500 | ||
|---|---|---|---|
| 001 | 12432877 | ||
| 003 | KEPU | ||
| 005 | 20170314115503.0 | ||
| 008 | 010606s2002 maua 001 0 eng | ||
| 010 | _a 2001041039 | ||
| 020 | _a0072435801 (alk. paper) | ||
| 040 |
_aDLC _cDLC _dDLC |
||
| 042 | _apcc | ||
| 043 | _an-us--- | ||
| 050 | 0 | 0 |
_aTH435 _b.P47 2002 |
| 100 | 1 |
_aPeurifoy, R. L. _q(Robert Leroy), _d1902-1995. _911731 |
|
| 245 | 1 | 0 |
_aEstimating construction costs / _cRobert L. Peurifoy, Garold D. Oberlender. |
| 250 | _a5th ed. | ||
| 260 |
_aBoston : _bMcGraw-Hill, _cc2002. |
||
| 300 |
_axvi, 560 p. : _bill. ; _c25 cm. |
||
| 440 | 4 |
_aThe McGraw-Hill series in construction engineering and project management _932687 |
|
| 500 | _aIncludes index. | ||
| 650 | 0 |
_aBuilding _xEstimates _zUnited States. _932688 |
|
| 700 | 1 |
_aOberlender, Garold D. _932689 |
|
| 856 | 4 | 2 |
_3Publisher description _uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-d.html |
| 856 | 4 | 1 |
_3Table of contents only _uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-t.html |
| 856 | 4 | 2 |
_3Contributor biographical information _uhttp://www.loc.gov/catdir/enhancements/fy0735/2001041039-b.html |
| 906 |
_a7 _bcbc _corignew _d1 _eocip _f20 _gy-gencatlg |
||
| 942 |
_2lcc _cBK _hTH435 _i.P47 2002 |
||
| 999 |
_c114174 _d114174 |
||